节点文献

快速干道路基排水测试方案研究

Study on the Flow Monitoring System of Express Way Subgrade Drainage

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 徐连军韦鹤平刘朴陆斌黄菊文

【Author】 XU Lian-jun 1 ,WEI He-ping 1 ,LIU Pu 2 ,LU Bin 1 ,HUANG Ju-wen 1 (1.College of Environmental Science&Engineering,Tongji University,Shanghai200092,China;2.Shanghai Pudong Project Development Co.Ltd.,Shanghai201203,China)

【机构】 同济大学环境科学与工程学院上海浦东工程建设管理有限公司同济大学环境科学与工程学院 上海200092上海200092上海201203上海200092

【摘要】 在上海市外环线(浦东段)二期工程中,突破了传统的道路排水设计,设置了综合排水试验段,建立了自动化的综合排水测试系统,实现了数据自动采集并通过电话拨号上网进行远程传送。着重论述了路基排水测试系统的水力学设计。

【Abstract】 During the second stage of urban outer-ring road project(Pudong section),the tradi-tional design of road drainage was reviewed and a synthetic drainage system was set up for exper-iment.A series of automatic test instruments that monitor synthetic drainage working was installed on the spot,and data were automatically gathered and telecommunicated online by dial.This paper mainly discusses the hydraulic design of the flow monitoring of subgrade drainage.

【基金】 上海市科委科技攻关项目
  • 【文献出处】 苏州科技学院学报(工程技术版) ,Journal of University of Science and Technology of Suzhou(Engineering and Technology) , 编辑部邮箱 ,2003年02期
  • 【分类号】U412.36
  • 【被引频次】2
  • 【下载频次】43
节点文献中: 

本文链接的文献网络图示:

本文的引文网络