节点文献

三峡电站调峰流量对航运的影响分析

Effects of peak regulation at Three Gorges Power Station on navigation

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 吴晓黎李承军张勇传余波

【Author】 WU Xiao li, et al (College of Hydropower & Information Engineering, HUST, Wuhan 430074, China)

【机构】 华中科技大学水电与数字化工程学院中国长江三峡工程开发总公司 湖北武汉 430074湖北武汉 430074湖北宜昌 443002

【摘要】 针对三峡—枝城河道的地形特征,建立一维非恒定流模型.在三峡电站预先给定的航运约束条件下,计算电站下游的非恒定流对航运的影响并对若干调峰流量过程曲线进行分析,找出满足航运要求的调峰曲线.提出可调整葛洲坝的库容水位关系,对三峡调峰流量进行反调节,削峰填谷,以满足航运要求.

【Abstract】 In accordance with the topographic characteristics of the Three Gorges Zhicheng river section, a 1 D unsteady flow model is developed. The effects of unsteady flow on navigation are calculated for the lower reaches of the power station under the given navigation restrictions and a series of peak regulation flow rates. By analysis of various peak regulation curves, curves meeting the navigation requirement are drawn. Finally, it is pointed out that the peak regulation flow rate at the Three Gorges Power Station can be adjusted by modification of the reservoir capacity water level relationship of the Gezhouba Reservoir, so that the navigation requirement can be satisfied.

【基金】 国家重大科技项目(攻关)计划子题:三峡枢纽梯级水库联合优化调度初步方案研究(97 312 06 1 5)
  • 【文献出处】 水利水电科技进展 ,Advances In Science and Technology of Water Resources , 编辑部邮箱 ,2003年06期
  • 【分类号】TV122.5
  • 【被引频次】23
  • 【下载频次】194
节点文献中: 

本文链接的文献网络图示:

本文的引文网络