节点文献

三峡永久船闸水力学安全监测

The safety monitoring on the hydraulics of Three Gorges permanent navigation lock

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 彭启友於三大邓浩陈绪春

【Author】 PENG Qi-you, YU San-da, DENG Hao, CHEN Xu-chun (China Yangtze Three Gorges Project Development Corporation, Yichang Hubei 443002)

【机构】 中国长江三峡工程开发总公司中国长江三峡工程开发总公司 湖北宜昌443002湖北宜昌443002湖北宜昌443002

【摘要】 三峡五级船闸抽水调试期和试运行期水力学监测成果的完整性和系统性较好,为工程的验收、制定船闸运行管理规程提供了科学依据,同时对今后国内外高水头船闸工程的设计和运行具有十分重要的参考价值。

【Abstract】 This article introduces mainly about the hydraulics monitoring results on five-grade ship lock of the Three Gorges Project during its pumping debugging period and during its trial operation period. The integrity and systematization of monitoring results are very good. It provides scientific basis for engineering acceptance and the formulation of ship-lock operation management rules. Meanwhile it also has great reference value for the design and operation of high-head ship-lock projects at home and abroad in the future.

  • 【分类号】U641
  • 【被引频次】3
  • 【下载频次】76
节点文献中: 

本文链接的文献网络图示:

本文的引文网络