龙滩大坝仓面长间歇和寒潮冷击的温控防裂分析

Analysis of temperature control and cracking prevention during long downtime on placement surface and cold wave strike for Longtan High RCC Gravity Dam

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 朱岳明贺金仁石青春

【Author】 ZHU Yueming1 ,HE Jinren2,SHI Qingchun3(1College of Water Conservancy and Hydropower Engineering,Hohai University,Nanjing,Jiangsu 210098;2 Zhejiang Design Institute of Water Conservancy and Hydroelectric Power,Hangzhou, Zhejiang 310002;3South China Investigation and Design Institute, Changsha, Hunan 410014)

【机构】 河海大学水利水电工程学院浙江省水利水电勘测设计院中南勘测设计研究院 江苏南京 210098浙江杭州 310002湖南长沙 410014

【摘要】 结合龙滩高碾压混凝土重力坝的设计和施工组织安排,进行了坝体最不利长间歇仓面和在长间歇期间遭遇坝区最大一次寒潮冷击的坝体温度应力的三维有限元仿真计算。计算结果表明,在不利高程262m仓面长间歇不会导致混凝土裂缝的产生;但是,如不采取任何温控措施,寒潮冷击必然会给坝体上下游面带来破坏性的影响,比如坝上游面劈头缝的产生。经对寒潮来临前采取不同保温措施的温度应力计算分析,建议在低温季节来临前就应适时采取2 5cm厚的泡沫塑料板进行坝体表面保温。另外,龙滩大坝还需采取综合性的温控防裂措施,以确保大坝不裂。

【Abstract】 According to the conditions of the design and construction plan of the Longtan high RCC gravity dam in China,the authors in this paper carried out the 3D finite element emulative analysis of the temperature field and thermal stress field of the dam during a long time cease of concrete placement and a worst cold wave strike. In line of the results a 60day long downtime couldn’t directly causes the cracks in the dam,even if the cease location has been selected at the worst elevation of 262 m. But if any thermal control measure will not be adopted before the cold wave comes,the dam must definitely be cracked by the strike of the cold wave,especially on both of the upstream and downstream surfaces of the dam. The most concerned head split cracks might take place inevitably. After the numerical calculation of the dam stresses under the conditions of using different thermal saving covers for the dam,the authors want here to suggest that the parts of the dam surfaces should be covered by thermal saving plastic plates with a thickness of 2.5 cm at an appropriate time before the low temperature season comes. Finally,taking into account the results calculated,one needs comprehensive temperature control and cracking prevention measures for the dam,in order to grantee that the dam will not be cracked.

【基金】 河海大学院士学科发展基金项目(03);国家电力公司"高碾压混凝土坝快速施工技术研究"攻关专题资助项目[KJ00 03 23 01 01(03)]
  • 【分类号】TV698.2
  • 【被引频次】49