Engineers adopted comprehensive measures from such aspects as material selection, matching ratio design, construction method, construction time selection, temperature measurement and concrete curing and so on to effectively control generation of cracks on concrete ground floor and walls of an underground garage. At the same time, it was unnecessary to add expanding agents, so concrete cost could be reduced.