节点文献

瀑布沟水电站泄洪洞开挖变形和稳定性分析

Excavation Deformation and Stability Ana lysis of Spillway Tunnel of Pubuguo Hydr opower Station

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 滕丽张建海刘会娟裴建良向俐蓉

【Author】 TENG Li,ZHANG Jian-hai,LIU Hu i-juan,PEI Jian-liang,XIANG Li-rong(School of Hydraulic Engineer ing,Sichuan University,Chengdu 610065,Ch ina)

【机构】 四川大学水电学院四川大学水电学院 四川成都 610065四川成都 610065四川成都 610065

【摘要】 瀑布沟水电站泄洪洞右侧壁最小厚度仅约10 0m,左侧山体高达100 0m,隧洞偏压问题突出。本文采用非线性有限元法,研究隧洞在开挖过程中,边坡的稳定性和隧洞的偏压应力。

【Abstract】 The minimum depth of the spillway tunnel from the slope s urface on the right side is only 10m whi le on the spillway left side the mountia n has a height of 100m.Therefore,the in situ stress on the right side of the spi llway tunnel is much higher than that on the left side.In this paper stability o f the slope and unbalanced side pressure of the spillway tunnel during its excav ation are studied by using nonlinear fin ite element method.

  • 【文献出处】 水电站设计 ,Design of Hydroelectric Power Station , 编辑部邮箱 ,2003年02期
  • 【分类号】TV223
  • 【被引频次】7
  • 【下载频次】85
节点文献中: 

本文链接的文献网络图示:

本文的引文网络