节点文献

广州珠江电厂3号机组ETS系统的DCS一体化改造

DCS INTEGRATING RETROFIT OF ETS SYSTEM FOR UNIT NO.3 IN ZHUJIANG POWER PLANT OF GUANGZHOU CITY

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 庄续奎

【Author】 ZHUANG Xu-kui

【机构】 广州珠江电厂 广东广州511458

【摘要】 广州珠江电厂对 3号机组进行DCS一体化改造 ,并将ETS也纳入了DCS改造范围。介绍了 3号机组改造后ETS的系统组成 ,电控系统各设备功能及特性 ,ETS电控系统所实现的功能及方式 ,DCS一体化改造后ETS系统的优缺点

【Abstract】 DCS integrating retrofit of unit NO.3 has been carried out in the title power plant, the ETS system having also been brought into the scope of DCS retrofitting. The composition of ETS system after said retrofitting, the function and performance of various equipments in the electric control system, the functions and mode realized by the ETS electric control system, as well as strong and weak points of ETS system after DCS integrating retrofit have also been described in this paper.

【关键词】 ETS改造DCS一体化电控系统珠江电厂
  • 【文献出处】 热力发电 ,Thermal Power Generation , 编辑部邮箱 ,2003年10期
  • 【分类号】TK32
  • 【被引频次】2
  • 【下载频次】92