节点文献
75MW后置机组启动过程的负胀差分析及处理
Analysis and Treatment of the Negative Differential Expansion Occurred During Startup of 75MW Post-turbine
【摘要】 详细介绍了75MW后置机组在启动过程中产生负胀差的处理措施,并通过实际运行数据对该机组产生负胀差的原因做了定性分析。
【Abstract】 The measures for the treatment of negative differential expansion occurred during stratup of 75MW post-turbine is presented in details, and an analysis on the reasons for the negative differential expension is made by using the data of actual operation.
- 【文献出处】 汽轮机技术 ,Turbine Technology , 编辑部邮箱 ,2003年01期
- 【分类号】TK267
- 【被引频次】1
- 【下载频次】45