两面临空条形矿柱回采方案的探讨

An Approach to Withdrawing Plan of Strip-shaped Pillar with Two-side Emptied Stopes

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 蔡汉迁玉子庆姜凡均

【Author】 Cai Hanqian1,Yu Ziqing1, Jiang Fanjun2(1. Tongken Mine, Liuzhou China Tin Group Co, Nandan, Guangxi 547207 China;2. Changsha Institute of Mining Research, Changsha, Hunan 410012, China )

【机构】 柳州华锡集团铜坑矿长沙矿山研究院 广西南丹县 547207广西南丹县 547207湖南长沙 410012

【摘要】 铜坑矿在开采92号矿体的过程中,形成一个长达200m,且两侧均为采空区的条形矿柱。对该矿柱提出了3种深孔空场回采方案。各方案均采用向一侧采空区抛掷爆破的方式回采。经过对3种回采方案的分析比较,选择推荐了一种最优的方案,其采切工程简单、回采效率高、回采费用和贫化损失指标低。

【Abstract】 A 200 m long stripshaped pillar with two-side emptied stopes remained during mining 92# orebody in Tongken mine. Three kinds of longhole openstope pillar withdrawing plans are presented. All plans are that the throwtype blasting toward oneside emptied stope is used. Based on the analysis and comparison of three kinds of pillar withdrawing plans, an optimal plan is selected, featuring simple preparatory work and cutting operation, high efficiency of withdrawing, as well as low withdrawing cost and dilutionloss index.

  • 【文献出处】 矿业研究与开发 ,Mining Research and Development , 编辑部邮箱 ,2003年02期
  • 【分类号】TD852
  • 【被引频次】9
  • 【下载频次】65
节点文献中: 

本文链接的文献网络图示:

本文的引文网络