引黄工程北干1号隧洞主要工程地质问题及施工对策
Main Engineering Geological Problems of and Construction Countermeasures for 1~# Tunnel of the North Trunk Line of Yellow River Diversion Project (YRDP)
【摘要】 万家寨引黄工程北干线1号隧洞,长43.9km,已完成5.47km,其余洞段即将施工。该隧洞埋深较大,且大部洞身位于区域地下水位以下,工程地质条件极为复杂,通过充分分析其工程地质问题,提出隧洞掘进施工对策。
【Abstract】 1# tunnel of the North Trunk Line of Yellow River Diversion Project (YRDP) is 43.9 km long and 5.47 km of it has been fulfiled, and other tunnel sections are to be constructed. The embedded depth of this tunnel is deeper, and most of the tunnel body is below the regional groundwater level, its engineering condition is very complicated. Through analyzing its engineering geological problems, this paper puts forward some countermeasures for the construction of the tunnelling construction.
【关键词】 引黄工程;
北干线;
隧洞;
地质问题;
施工对策;
【Key words】 Yellow River Diversion Project; North Trunk Line; tunnel; geological problem; construction countermeasure;
【Key words】 Yellow River Diversion Project; North Trunk Line; tunnel; geological problem; construction countermeasure;
- 【文献出处】 科技情报开发与经济 ,Sci/tech Information Development & Economy , 编辑部邮箱 ,2003年12期
- 【分类号】TV554
- 【下载频次】22