炼铁高炉上料斜桥空中对接施工
Butt construction of feeding bridge of iron-smelting furnace
【摘要】 介绍了临钢炼铁高炉斜桥制作安装的施工过程 ,对施工工序之间的配合及要点做了详细阐述 ,指出必须准备充分 ,组织精细 ,认真施工 ,协调配合 ,才能保证施工质量 ,缩短工期 ,达到设计要求
【Abstract】 In this article the feeding bridge’s fabrication and installation processes of iron smelting furnace in Linfen Iron and Steel Co. Ltd are introduced. According to the cooperation between construction procedures and construction gist detailed discussion is made. Author points out that based upon serious construction, good preparation, elaborate organization and harmonious cooperation the construction quality can be ensured and the design requirements can be meted.
- 【文献出处】 山西建筑 ,Shanxi Architecture , 编辑部邮箱 ,2003年04期
- 【分类号】TU758.11
- 【下载频次】27