节点文献

基于资源约束的制造企业业务过程设计方法

MANUFACTURING BUSINESS PROCESSDESIGN TECHNIQUE BASED ONRESOURCE-CONSTRAINT

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 张建娜唐任仲汤洪涛

【Author】 Zhang Jianna Tang Renzhong Tang Hongtao (Zhejiang University)

【机构】 浙江大学现代制造工程研究所浙江大学现代制造工程研究所 杭州 310027杭州 310027杭州 310027

【摘要】 为降低业务过程设计的风险,针对制造企业的特点,提出了基于资源约束的制造企业业务过程设计方法:以企业消耗性资源、非消耗性资源和信息资源为约束,根据客户对企业产品的要求倒推出过程活动和所需资源类型及数量,从而设计出可执行的业务过程方案。最后运用上述方法对某企业塑料灯罩生产业务过程设计进行了案例分析。

【Abstract】 To reduce the risk of business process design, aiming at manufacturing’s feature, a manufacturing business process design technique is developed, which is constrained by manufacturing resources such as renewable resources, nonrenewable resources and information resources. From the analysis of customer-requirement of products, the process activities as well as the type and quantity of the required resources are conversely deduced, which result in feasible business process design. Finally, the proposed technique is illustrated by a producing business process of plastic lampshade.

【基金】 国家自然科学基金(70071029);浙江省科技计划(011106241)资助项目
  • 【文献出处】 机械工程学报 ,Chinese Journal of Mechanical Engineering , 编辑部邮箱 ,2003年09期
  • 【分类号】F407.4
  • 【被引频次】9
  • 【下载频次】129
节点文献中: 

本文链接的文献网络图示:

本文的引文网络