【摘要】 在鸡西发电厂1号、2号机组调试过程中,发现2号机组制粉系统存在三次风速偏高等问题,经过对原设计制粉系统的热力计算进行重新校核验算,增加了三次风燃烧器喷口的截面积,降低了三次风速,使锅炉的热风温度能够满足制粉系统干燥出力的要求。
【Abstract】 It was found during the commissioning of No.1 and 2 powder generators that the powder making system of No.2 power generators had the problem of higher exhaust gas draft velocity, and after the check calculation of thermal force for the original powder making system, the cross-sectional area of the exhaust gas draft burner nozzle was increased to reduce the exhaust gas draft velocity so that the temperature of hot draft from the boiler could satisfy the requirement for the dry output from the powder making system.
【关键词】 制粉系统;
热力计算;
三次风;
热风温度;
【Key words】 powder making system; calculation of thermal force; exhaust gas draft; temperature hot draft;
【Key words】 powder making system; calculation of thermal force; exhaust gas draft; temperature hot draft;
- 【文献出处】 黑龙江电力 ,Heilongjiang Electric Power , 编辑部邮箱 ,2003年06期
- 【分类号】TM621.2
- 【被引频次】1
- 【下载频次】77