节点文献

莲花水电站水轮发电机安装及研究

Installation of water turbogenerators at lotus hydraulic power station

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 金昌范杨玺印黄少坚

【Author】 JIN Changfan ,YANG Xiyin, HUANG Shaojian( Harbin Power Station Engineering Co. ,Ltd,Harbin 150040,China; Harbin Electric Motors Co. ,Ltd,Harbin 150040, China; Heilongjiang Electric Power Development and Construction Croup,Harbin 150036,China)

【机构】 哈尔滨电站工程有限公司哈尔滨电机厂有限责任公司黑龙江省电力开发建设集团公司 黑龙江哈尔滨 150040黑龙江哈尔滨 150040黑龙江哈尔滨 150036

【摘要】 介绍了莲花水电站137.5 MW水轮发电机的主要结构及主要部件的安装工艺和安装特点,重点阐述了该水电站水轮发电机定子安装、转子安装、下机架及推力轴承安装、机组轴线检查及机组中心的调整。该水轮发电机投运后,运行平稳,满足设计要求。

【Abstract】 The primary construction of 137.5 MW water furbogenerators at lotus hydranlic power station,and the installation processes and installation special features of its major parts and components are discussed in detail with emphasis on installations of stators and rotors,bottom framework and thrust bearings,check of generators fox axis, and adjustment of generator centre. The steady operation of this water turbogenerator satisfies the design requirement.

  • 【文献出处】 黑龙江电力 ,Heilongjiang Electric Power , 编辑部邮箱 ,2003年04期
  • 【分类号】TV734.1
  • 【被引频次】1
  • 【下载频次】64
节点文献中: 

本文链接的文献网络图示:

本文的引文网络