节点文献
秦山核电二期工程一号机组反应堆首次启动物理试验的预分析
Prediction Analysis for First Startup Physics Test for Unit 1 of Qinshan Phase II NPP Project
【摘要】 叙述了秦山核电二期工程一号机组反应堆首次启动物理试验理论分析模型、程序和计算结果与测量值的比较。结果表明,理论预计值与实测结果符合良好。
【Abstract】 This paper described the calculation methods, codes and comparison between calculation values and experimental results for the first reactor startup physics test for Unit 1 of Qinshan Phase Ⅱ NPP Project. The results of reactor startup physics test showed that the theoretical calculated values are consistent with measured values.
- 【文献出处】 核动力工程 ,Nuclear Power Engineering , 编辑部邮箱 ,2003年S1期
- 【分类号】TL32
- 【被引频次】5
- 【下载频次】164