【摘要】 秦山核电二期工程是我国首座自主设计的中型核电站。中国核动力研究设计院(NPIC)在吸取过去的设计经验和跟踪国外核电站先进技术的基础上,成功地完成了秦山核电二期工程反应堆堆顶的设计。本文对其设计进行了介绍。秦山二期1号机组的运行实践证明,该反应堆堆顶的设计是合理可行的。
【Abstract】 The Qinshan Phase Ⅱ NPP Project is the first middle-scale nuclear power plant designed independently by China. NPIC have finished the design of PRV head package based on the design experience of PRV head package of naval ships and the advanced design technology used in the nuclear power plants in the world. The paper primarily introduces the design of PRV head package. The unitⅠof Qinshan phase II have been operated successfully which has proved that the design by NPIC is reasonable.
【关键词】 反应堆堆顶;
抗震支承;
通风罩;
电缆托架及电缆桥;
设计;
【Key words】 PRV head package; Seismic support platform; Fans ducts; Electric cable tray; Design.;
【Key words】 PRV head package; Seismic support platform; Fans ducts; Electric cable tray; Design.;
- 【文献出处】 核动力工程 ,Nuclear Power Engineering , 编辑部邮箱 ,2003年S1期
- 【分类号】TL351
- 【下载频次】130