节点文献

盘道岭隧洞加固处理期监测设计及仪器埋设

Monitoring Design and Instrument Embedment of Pandaoling Tunnel During Consolidation Period

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 张毅

【Author】 Zhang Yi (The Water Resources and Hydro electric Investigation and Design Institude of Gansu)

【机构】 甘肃省水利水电勘测设计研究院

【摘要】 盘道岭隧洞是我国已建的最长的软岩无压引水隧洞,隧洞洞身穿过地段地质条件复杂多变,由于种种原因造成二次衬砌开裂,在加固处理二次衬砌裂缝时,要求通过监测手段来定量评价加固处理效果及判明洞身围岩稳定状态。论述了加固处理中监测内容的确定、设备选型及其特性、观测设备的总体布置原则,同时提出了各主要仪器的埋设方法,说明了主要监测成果及结论。

【Abstract】 Pandaoling diversion tunnel is the longest and free flow tunnel surrounded with soft rock in our country. Because of all kinds of reasons, the second lining split. The tunnel has complicated engineering geologic conditions and surrounded with both soft and hard rocks. Thus the consolidation effects and the steady state of tunnel surrounding rocks must be evaluated. This paper discusses how to determine the monitoring content, to select instruments as well as its specific property, to arrange observing instruments, and to put forward embedment method of main instruments. The main monitoring results and conclusion are also presented.

【关键词】 隧洞监测系统设计观测仪器埋设
【Key words】 TunnelMonitoring systemDesignObservation instrumentEmbedment
  • 【文献出处】 陕西水力发电 ,JOURNAL OF SHAANXI WATER POWER , 编辑部邮箱 ,1998年02期
  • 【分类号】U456.3
  • 【被引频次】1
  • 【下载频次】43
节点文献中: 

本文链接的文献网络图示:

本文的引文网络