节点文献
嫩江江桥站 1998 年特大洪水决口情况下洪峰流量的推算
1998’s Flood Volume Calculation of Nenjiang River Jiangqiao Station
【摘要】 嫩江江桥站1998年8月特大洪水发生决口,通过分析水面流速系数,推算决口情况下主槽和决口处的洪峰流量,并进行误差分析。
【Abstract】 The dyke in Jiangqiao Hydrologic Station of Nenjiang River was breached during 1998’s extraordinary floods.The peak flood volume of the section was calculated through analysis of surface velocity efficient,the calculating error was analysed.
- 【文献出处】 黑龙江水专学报 ,JOURNAL OF HEILONGJIANG HYDRAULIC ENGINEERING COLLEGE , 编辑部邮箱 ,1998年04期
- 【分类号】P333.1
- 【被引频次】5
- 【下载频次】42