JIT系统下的单机提前/拖期调度问题

Early/Tardy Machine Scheduling Problem in JIT Systems

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 吴悦汪定伟

【Author】 Wu Yue,Wang Dingwei

【机构】 东北大学信息科学与工程学院

【摘要】 分别研究了交货期及交货期窗口下的单机调度问题,目标是寻找一个最优调度极小化提前/拖期任务数.假设如果任务在交货期或交货期窗口内完工,则不受处罚;否则,就要受到一个固定的提前/拖期惩罚.提出了在交货期及交货期窗口下的寻找最优调度的多项式算法,并以两个实例说明了算法.

【Abstract】 It was done on a single machine to deal with due date and due window problems. The objective was to find a shcedule that minimizes the number of early and tardy jobs. It was assumed that each job was not penalized if its completion timed within due window. Otherwise,it would be penalized by the fixed identical weight. Two polynomial algorithms were presented to find the optimal schedule for due date and due window and two examples were shown to illustrate the algorithms.

【关键词】 IT系统最优调度交货期
【Key words】 JIT systemsoptimal scheduledue date.
【基金】 国家自然科学基金
  • 【文献出处】 东北大学学报 ,JOURNAL OF NORTHEASTERN UNIVERSITY , 编辑部邮箱 ,1998年06期
  • 【分类号】TP13
  • 【被引频次】9
  • 【下载频次】139
节点文献中: 

本文链接的文献网络图示:

本文的引文网络