高边坡工程中预应力锚索间距与开挖顺序的优化
【摘要】 本文探讨高边坡开挖与加锚的优化设计,主要是预应力锚索的最优间距和开挖的最优顺序.对某大型水电工程的应用计算显示,成果可信.
【Abstract】 The paper discusses an optimum design of excavating and strengthening high rock slopes including the optimal schedule of excavating as well as anchoring and optimal spaces of pre stressed cables. The applications to a certain large hydropower station have been introduced. The results are reasonable.
【关键词】 岩质高边坡;
动态规划;
锚索间距;
开挖顺序;
优化;
【Key words】 high rock slope; dynamic programming; sequence of operations for excavating and anchoring; space of pre stressed cables.;