上海外高桥电厂一期工程综合试桩
Synthesize Piling Tests of Shanghai Waigaoqiao Power Plant Phase 1
【摘要】 上海外高桥电厂一期工程装机容量4×300MW,4台机组已于1997年8月前陆续并网发电,运行情况良好。电厂主要建(构)筑物采用钢管桩,通过岩土工程勘察和多种原位测试及工程试桩,对桩基方案进行了优化,为国家节约了大量费用。
【Abstract】 the installation capacity of the first phase of Shanghai Waigaoqiao Power Plant is planned to be 4×300MW,4 sets have been generated already before in Aug. 1997, the operation condition is good. Steel pipe piles are used in main buildings and structures of the plant. Through the geotechnical investigation and various in situ tests and engineering piling tests, pile foundation plans are compared and taken priority. A large of expenses is saved.
- 【文献出处】 上海地质 ,Shanghai Geology , 编辑部邮箱 ,1997年03期