三峡枢纽上游引航道布置方案及坝前流态的试验研究

Experimental study on arranging the navigation channel and flow pattern in the upstream of TGP dam

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 兴奎陈稚聪王桂仙王光谦府仁寿

【Author】 Wang Xingkui, Cheng zhicong, Wang Guixian, Wang Guangqian, Fu Renshou Department of Hydraulic and Hydropower Engineering, Tsinghua University, Beijing 100084

【机构】 清华大学水利水电工程系

【摘要】 三峡枢纽运行中后期,上游引航道隔流堤将永久船闸和升船机的航道包括在内(即大包方案)为技术设计专题研究论证的优选方案。在此基础上提出了船闸从堤外取水的设想,从而可以较好地解决堤内往复流和水位波动、航道内淤积等航运的关键技术问题。流态试验的结果表明,如将三期纵向围堰加高到148米高程,右电厂直接从围堰右侧进水,则能明显地改善坝前的流态,对保证枢纽的过流能力和增加发电量都有重要意义。

【Abstract】 For the condition of Three Gorges project (TGP) operating for about thirty years, the separating dike which includes both the ship lock and the ship lift is recommended as the optimum scheme in the technical design. The intake of ship lock locates outside of the dike is also suggested in this paper. Problems of the reciprocating flow, water stage fluctuation and the sediment deposition in navigation channel can be well solved by this scheme. A suggestion to raise the third stage longitudinal cofferdam to elevation 148 m will guide the water flow from the right side of the cofferdam to the right powerhouse. The experimental results indicate that it will much improve the flow pattern to guarantee the sluicing capacity of the outlet work and the power generation of the project.

【基金】 国家自然科学基金
  • 【文献出处】 清华大学学报(自然科学版) ,JOURNAL OF TSINGHUA UNIVERSITY(SCIENCE AND TECHNOLOGY) , 编辑部邮箱 ,1997年08期
  • 【分类号】TV642.1
  • 【被引频次】4
  • 【下载频次】73