节点文献
葛洲坝换流站UZ92母差保护误动分析
THE ANALYSIS OF MALOPERATION OF THE HIGH-IMPEDANCE DIFFERENTIAL PROTECTION TYPE UZ92 IN THE GEZHOUBA COMMUTATION STATION
【摘要】 1995年7月22日,隔河岩电厂#3机并网过程中,发电机出口开关A相触头对地击穿,葛洲坝换流站I母UZ92(BBC)高阻抗母线差动保护误动跳闸。本文通过计算分析,阐明了这次误动跳闸是由于清换线A相故障电流感应所致。
【Abstract】 The high-impedance busbar differential relay type UZ92 of busbar I in the Gezhouba commutation station maloperated and tripped due to phase A contact head of circuit breaker of No. 3 generator get flashover to ground in Geheyan Hydro Power Plant during No. 3 generator closed onto system on July 23th 1995. The reason of the maloperation is expounded with detail caculation and analysis in this paper.
- 【文献出处】 电网技术 ,POWER SYSTEM TECHNOLOGY , 编辑部邮箱 ,1997年02期
- 【分类号】TM77
- 【被引频次】1
- 【下载频次】28