节点文献
地下水数值模拟在液体矿采矿设计中的应用
Application of numerical simulation groundwater in mining design for liquid mining
【摘要】 青海钾肥二期工程设计中提出了井群集卤开采方案,为了解决多方案大规模并群计算中庞大的数据处理问题、了解开采生产后区域抽采漏斗的动态变化全过程,以便制定细致、合理的开采方案,引入了地下水数值模拟方法,在计算机上实现了各种方案开采状态的实时模拟。实践证明这一方法是可行的、先进的。
【Abstract】 Salt brine mining by group wells is put forward in the second phase engineering design of Qinghai Potash Fertilizer Project. For solving enormous data processing in the calculation of multi-origrams for large-scale group wells, knowing the whole dynamic changes of regional mining funnels after mining and working out a detailed and reasonable mining program, a groundwater red-time numerical simulation is realized in computer with various programs’mining states.The method is practically Proved feasible and advanced.
- 【文献出处】 化工矿山技术 , 编辑部邮箱 ,1996年06期
- 【分类号】TD871.1
- 【被引频次】1
- 【下载频次】102