节点文献
秦皇岛港煤码头四期工程翻车机房圆形地下连续墙施工
Construction for Round Diaphragm Wall of Car Dumper Shed of the Fourth Stage Project of Coal Terminal, Qinhuangdao Port
【摘要】 简述翻车机房圆形地下连续墙的施工工艺和施工经验。
【Abstract】 The construction technology and experiences for the round diaphragm wall of car dumper shed are briefly described in the paper.
- 【文献出处】 港工技术 ,Port Engineering Technology , 编辑部邮箱 ,1996年01期
- 【分类号】U655
- 【被引频次】8
- 【下载频次】56