节点文献
铁鳞竖炉还原生产洁净海绵铁的模拟试验
PRODUCTION TEST PURE SPONGE IRON IN SIMULATED REDUCTION SHAFT FURNACE WITH SCALE
【摘要】 该工艺综合了Hoganas法及K-M法优点,采纳了引锭技术,在5kg/d热模拟竖炉中,用粉状炉料生产了洁净的海绵铁。文中介绍了竖炉工艺及主要操作特点和产品,还侧重介绍了炉料顺行技术和强化还原的研究工作。
【Abstract】 This technology has advantages of Hoganas process and Kinlor-Metor(K-M)process and adoptes ingot-inducing technique. The pure sponge iron was producted with powder material on a 5 kg/d-scale hot simulation shaft furnace. The construction of shaft furnace,the character of the technology,the main operation paramaters and the produet are in troduced in this paper,and t he study on regular movement technique and intensifing reduction are emphasized.
- 【文献出处】 钢铁 ,IRON AND STEEL , 编辑部邮箱 ,1995年S1期
- 【分类号】TF554
- 【下载频次】73