三峡工程离散化枢纽布置研究

Study on Dissociated General Playoutof Three Gorges Project

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 黄达海哈秋舲

【Author】 Huang Dahai (Gezhouba Znstitute of Hyclro electric Engineering) Ha Qiulin (China Yantze Three Gorges Project Development Corporation)

【机构】 葛洲坝水电工程学院建筑工程系中国长江三峡工程开发总公司

【摘要】 离散化枢纽布置是相对于枢纽集中布置而言的。具体到三峡工程,即表现为三组厂房枢纽与两组厂房枢纽的不同。三组厂房枢纽更多地考虑了施工工作面的数量对基本工期与总工期长短的决定意义,在纷繁复杂的矛盾中,把提前发电的巨大效益排在首位,以电站建筑物为核心来组织三峡工程的枢纽布置,是一个不可忽视的枢纽布置方案。

【Abstract】 Dissociated general playout for a reservoir is relative to reservoirs playouted concentratively.As to Three Gorges Project,there are certain differences between Two groups plan and Three groups plan.The latter has more considered about the quantity of constructing surfaces that affects the basic construction period and the total construction period greatly.In order to solve all kinds of contradiction connected with the general playout, this paper puts huge efficiency on first place,which will be obtained by going to powering ahead of time,and also makes a hard core place for housebuilding when playing Three Gorges Station.

  • 【文献出处】 葛洲坝水电工程学院学报 ,Journal of Gezhouba Institute of Hydro-Electric Engineering , 编辑部邮箱 ,1994年02期
  • 【分类号】TV61