节点文献
碾压混凝土坝采用台阶式溢洪道消能初探
A Preliminary Study on Stepped Spillway on RCC Dam for Dissipation
【摘要】 台阶式溢洪道在国外许多碾压混凝土坝上得到采用,本文通过试验,分析了台阶式溢洪道的消能特性、单宽流量与消能率的关系,以及台阶面坡度对消能率的影响,以便探讨在我国碾压混凝土坝上应用台阶式溢洪道的前景.
【Abstract】 With the development of RCC dam, stepped spillways are used in many RCC dams. Ahydraulic model investigation was conducted to evaluate the per formance of a stepped spillway, andthe effectiveness of energy dissipation due to slope of the spillway face, and to evaluate possibility ofapplication in RCC arch dams.
【关键词】 台阶式溢洪道;
消能率;
台阶面;
光滑面;
【Key words】 stepped spillway; energy dissipation efficiency; stepped face; smooth face;
【Key words】 stepped spillway; energy dissipation efficiency; stepped face; smooth face;
- 【文献出处】 水利水电技术 ,Water Resources and Hydropower Engineering , 编辑部邮箱 ,1994年04期
- 【分类号】TV65
- 【被引频次】49
- 【下载频次】197