节点文献

人工壁柱房柱法采场地压的发展及控制

The Ground Pressure Development and Control of the Room-and -PillarMining Stope with Man-Made Wall Pillars

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 祝禄发

【Author】 Zhu Lufa

【机构】 锡矿山矿务局

【摘要】 本文综合分析了锡矿山北矿童家院矿床岩石移动、岩体声发射和光应力计观测结果,通过和以往南矿大面积地压发生和发展过程中地压监测结果的对比分析,指出童家院矿床三中段127~193采场目前处在大面积地压预兆期,并提出应采取的地压控制措施。

【Abstract】 Abstract The paper analyses comprehensively the observation results of the rock displacemeter gauge,rock body’ sound emission meter and optical stress gauge for Tongjiaguan deposit of the North Mine in Xikuangshan. Through the comparative analysis with the inspection results during the occurrence and development of the large-area ground pressure in the South Mine,the paper points out that the 127~193 stope of the third middle section in Tongjiaguan deposit is now in the signs period of the large-area ground pressure and makes the suggestions on the measures that should be taken to control the ground pressure.

【关键词】 人工壁柱房柱法采场地压控制
  • 【分类号】TD323
  • 【被引频次】7
  • 【下载频次】59
节点文献中: 

本文链接的文献网络图示:

本文的引文网络