仰山三级电站引水隧洞糙率原型观测

Original Observation of the Roughness on the Access Tunnel of Yangshan Three-cascade Hydro-power Plant

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 张良然陈合爱康仲律王湘生江胜文甘树令

【Author】 Zhang Liangran Chen Heai Kang Zhonglu Wang Xiangsheng(Jiangxi Polytechnic University, Nanchang 330029) Jiang Shenwen Gen shuling(Fengxin Water Conservancy and Hydro-electric Bureau, Fengchuan County 330700)

【机构】 江西工业大学奉新县水电局奉新县水电局 南昌 330029南昌 330029冯川镇 330700

【摘要】 仰山三级电站引水隧洞为不衬砌隧洞,只在弯道段和岩体破碎段进行了全断面衬砌。文中介绍了不衬砌隧洞糙率的计算方法,并根据原型观测资料得到仰山三级电站引水隧洞不衬砌段的实际糙率。

【Abstract】 The access tunnel of Yangshan three-stage hydro-power plant is lined around the tunnel at bends and reaches of rock rupture but is nonlined at other reaches. In this paper, a computing method of the roughness on nonlined tunnels is presented, and the real roughness on the access tunnel of Yangshan three-stage hydro-power station is obtained based upon the original observed data.

【关键词】 原型观测不衬砌隧洞糙率
【Key words】 original observationnonlined tunnelroughness.