【摘要】 太平哨电厂原设计全厂发电4 × 40.25MW,欲提高出力至 4 × 43.00MW.在对该厂机组增容可行性进行论证的基础上,对原设计进行了校核和分析.研究结果表明:太平哨电厂机组提高出力至 4×43.00 MW条件具备,全厂调峰容量可增加11MW.

【Abstract】 The original design capacity of Taipingshao Water Power Plant is 4 ×40. 25 MW, and intended to be increased to 4 ×43.0 MW. Checking and analysing against the original design are carried out on the basis of capacity raising feasibility study. The research result shows that: conditions for the capacity raising for Taipingshao Water Power Plant are sufficient. The total capacity of the plant can be raised 11.0MW.

【关键词】 机组容量压力管道非线性有限元
【Key words】 unit capacitypenstocknonlinearfinite elements