节点文献

MJ-φ1200×3000塔式磨浸机的研制与试验

DEVELOPMENT OF MJ-Φ1200×3000 tower pulverizing-leaching mill

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 吕谦张佩璜吴敏杰罗琨孟宇群

【Author】 Lu Qian (Institute of Metal Research, Academia Sinica, Shenyang)

【机构】 中科院金属研究所中科院金属研究所

【摘要】 针对传统氰化提金工艺能耗高、浸出速度慢、流程较长等问题,进行了边磨边浸氰化提金新工艺的研究,塔式磨浸机是该工艺的核心设备。本文论述了塔式磨浸机的构造、工作原理、基本设计过程及主要技术特点。试验结果表明,与同规模CIP工艺的磨浸工序相比,利用该设备提金,磨矿效率可由原来的9.3kg/kW·h提高到24.5kg/kW·h,浸出时间由几十个小时降至1.5h,磨浸工序电耗为30kW·h/t矿,节电60%左右,工艺流程也大大简化。

【Abstract】 Directed against the Problems existed in the conventional cyanide process, such as high energy consumption, low leaching rate and complicated Process flowsheet, a study of gold recovery by cyanide leaching while Pulverizing was made. In this way, the tower Pulverizing-lcaching mill was the key equipment to this technology. In this paper,the construction, work Principle, basic design and main technical characteristics of the tower Pulverizing-leaching mill were discussed. Comparing with the working procedure of grinding and leaching of the same scale ores in CIP Process.the Pulverizing efficiency was raised from 9.3kg/kwh to 24.5kg/kwh, leaching time was reduced to 1.5 hours, electricity consumption was cut down about 60% and the Process flowsheet was short-cut.

  • 【被引频次】5
  • 【下载频次】53
节点文献中: 

本文链接的文献网络图示:

本文的引文网络