节点文献

淤地坝系拦泥、滞洪坝高的双优化

Double optimization of dam heights to retard mud and flood for the system of check dam

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 武永昌崔云鹏梁文辉白小丽

【Author】 Wu Younchang Cui Younpeng (Northwest College of Forestry)Liang Wenghui Bai Xiao (Soil and Water Conservation of Pingliang District in Gansu Province)

【机构】 西北林学院甘肃省平凉地区水土保持研究所甘肃省平凉地区水土保持研究所 陕西杨陵区陕西杨陵区甘肃平凉

【摘要】 考虑到淤地坝的最优拦泥坝高与最优滞洪坝高之间存在着密切的关系,本文提出了在坝系优化规划中对两种坝高同时进行优化的思路及数学模型。在数学模型中避免了对经济、社会及生态效益的计算,采用了能间接反映三种效益而又较为简单的目标函数及约束条件。文中有计算实例。

【Abstract】 Considering the close relationship between the optimum dam height to retard mud and the optipum dam height to detention flood, the thinking and mathematical models to optimize the two height simu- oteniously in the optimal planning of the dam system are raised.In the models the calculation on economical,social and ecological benefits is avoided,accepting the simpler goal function and limitation conditions that could reflect the three benefits indirectly.It gives the example of calculation.

  • 【文献出处】 水土保持学报 ,Journal of Soil and Water Conservation , 编辑部邮箱 ,1991年01期
  • 【被引频次】24
  • 【下载频次】96
节点文献中: 

本文链接的文献网络图示:

本文的引文网络