节点文献
连续采煤机房柱式工作面生产的计算机模拟
COMPUTERIZED SIMULATION OF ROOM-AND-PILLAR WORKING FACES WITH CM
【摘要】 本文用模拟的方法来确定连续采煤机房柱式工作面的生产能力,提供了最优煤房尺寸。可为矿井和采区设计提供依据。
【Abstract】 This paper determines the production capacity of the room-and-pillar working faces with continuous miner using simulation method, presents the optimal room dimensions and provides the basis for the design of coal mines and mining distriets.
【关键词】 连续采煤机;
房柱法;
计算机模拟;
非线性回归;
相关系数;
回采工作面;
矿柱回采;
【Key words】 : continuous miner; room and pillar method; computerized simulation; non-linear regression; correlation coeffieients; coal face; pillar recovery;
【Key words】 : continuous miner; room and pillar method; computerized simulation; non-linear regression; correlation coeffieients; coal face; pillar recovery;
- 【文献出处】 山东矿业学院学报 ,JOURNAL OF SHANDONG MINING INSTITUTE , 编辑部邮箱 ,1990年01期
- 【下载频次】19