老矿井孤立煤柱开采与冲击地压防治研究
THE MINING ISOLATED PILLARS IN OLD MINE AND RESEARCH ON PREVENTION AND REMEDY FOR ROCK-BURST
【摘要】 本文结合城子矿—250m水平孤老煤柱安全采出的实践,论述了防治冲击地压措施中的几个问题。其中,主要有合理选择、开拓布署、超前卸压爆破、卸压钻孔及避峰送巷等。
【Abstract】 In combination with the practice that the isolated old pillars at level-250m in Cheng Zi mine are extracted out, the paper discusses some problems about measures of prevention and remedy of rock-burst, such as choosing reasonable engineering plan, unloading blas and unloading drilling before mining coal sems and avoiding peak value of stress in coal seam for driving headings, etc.
【关键词】 煤柱;
冲击地压;
开拓布署;
卸压爆破;
避峰送巷;
【Key words】 the isolated old pillar; rock-burst; engineering plan; unloadingblast; avoiding peak value for driving heading;
【Key words】 the isolated old pillar; rock-burst; engineering plan; unloadingblast; avoiding peak value for driving heading;
- 【文献出处】 阜新矿业学院学报(自然科学版) , 编辑部邮箱 ,1990年04期