节点文献

城子矿—250米水平八层煤西巷煤柱开采可行性分析

ANALYSIS OF THE PRACTICABILITY OF PILLARING AT LEVEL-250M AT WEST HEADING IN COAL SEAM 8 IN CHENG ZI MINE

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 赵本钧梁政国梁纯生

【Author】 Zhao Benjun Liang Zhengguo Liang Cunsheng

【机构】 合肥煤研所阜新矿业学院阜新矿业学院

【摘要】 本文通过数值模拟计算及煤岩实验分析,较详细地介绍了城子矿—250米水平八层煤西巷呆滞煤柱开采可行性。该煤柱尚有一定的流变现象,但其四周存在着较高的应力集中地段,它是冲击地压显现的危险区域,在回采中应采取切实可行的措施加以防治。

【Abstract】 Through the calculation of numerical simulation and analysis on the experiments of coal and rock, the paper has in detail introduced the practicable degree of mining placing idle pillars at level -250m at west heading in coal seam 8 in Cheng Zi mine. The pillars still have some flow strain appearances, but there is a section of an area of stress concentration around the pillars. The section is a dangerous area of appearing rock-burst. In the process o the extraction the practicable measures must be taken to prevent and remedy rock-burst.

  • 【文献出处】 阜新矿业学院学报(自然科学版) , 编辑部邮箱 ,1990年04期
  • 【下载频次】41
节点文献中: 

本文链接的文献网络图示:

本文的引文网络