节点文献
秦山核电厂压水堆燃料元件综合考验
THE IN-PILE PROVING TEST FOR FUEL ASSEMBLY OF QINSHAN NUCLEAR POWER PLANT
【摘要】 1985年1月到1986年12月,在中国原子能科学研究院重水研究堆上,为秦山核电厂压水堆燃料组件作了堆内考验。元件单棒平均燃耗和峰值燃耗分别达到27000MW·d/tU和34000MW·d/tU,已满足设计要求。文章描述了堆内考验的基本情况。重点讨论了考验参数并分析了初步试验结果。
【Abstract】 The in-pile proving test for fuel assembly of Qinshan nuclear power plant had been conducted in the experimental loop of HWRR at IAE in Beijing, China from January 1985 to December 1986. Average burnup of 27000 MWd/tU and peak burnup of 34000 MWd/tU of fuel rod had already been reached. The basic status of the experiment are described, emphasis is placed on the discussion of proving test parameters and analysis of experiment results.
- 【文献出处】 中国核科技报告 ,China Nuclear Science and Technology Report , 编辑部邮箱 ,1989年S3期
- 【下载频次】36