再谈竖井施工机械化最优配套方案的选择
DISCUSSING AGAIN THE CHOICE OF MATCHING PLAN OF MECHANIZING MINE CONSTRUCTION
【摘要】 本文建立了满足竖井平均月进度要求机械化配套后费用最省,平均月进度最高的数学模型。为解题方便,提出了按分系统分步求解的方法。
【Abstract】 The mathmatical model , which not only cost is the lowest and economical, but also average advance per month is the highest, has been suggested in the paper. In order to solute the problem conveniently, the solution way based on the splits system and separated steps is also put forwad in the essay.
【关键词】 机械化作业线;
供料系统;
分系统;
目标函数;
线性规划;
非线性规划;
可行解点;
运输系统;
【Key words】 mechanical operating line; material supply system; splits system; objective function; linear programming; nonlinear programming; feasible solution point; transporting system;