【摘要】 <正> 一、前言 伊春林区电力建设从1962年开始,至今已初具规模。该林区现有发电厂12座,单机容量最大为25000kw,最小为1250kw。现有110kv、60kv、35kv输电线路近400km。10.5kv、6.3kv配电线路遍布林区各城镇(见图1)。

【Abstract】 Yichuu Forest Zone is an important wood production base of Chiha. The capability of the power system in this region is increasing continually with the development of the forest production.The setting-up of the Jinshan Power Station has brought out a new difficult problem for the forest zone power system. In order to save energy and to top potentialities some practicable measures for the efficient operation of this system are provided in this paper. It is a valuable reference to the department concerned for safe operation.

  • 【文献出处】 东北林业大学学报 ,Journal of Northeast Forestry University , 编辑部邮箱 ,1985年03期
  • 【被引频次】1
  • 【下载频次】44
节点文献中: 

本文链接的文献网络图示:

本文的引文网络