网络计划资源工期优化
Optimization of the resource and duration in activity networks
【摘要】 本文应用分枝定界法解网络计划资源有限、工期最短的优化问题,系统地分析了这一问题的分枝、定界的原则和方法,以及解题步骤。
【Abstract】 In this paper,the Branch and Bound approach is used to solve the optimum problem on activity networks with limited resource and the shortest duration. The principles and methods of the branching and bounding with regard to this problem are discussed systematically, moreover the corresponding procedures for solving are also illustrated.